beautypg.com

CEMB USA ER100 (A) User Manual

Page 7

background image

7

25Nm

5

6

7

Use and Maintenance Manual Rev. 11-2010

ENGLISH

Drill the holes in the floor and fit the expandable bolts provided as indicated in the drawing and tighten them to a

5.

torque of 25 Nm. As indicated in the box, in the last phase, fasten the mounting brackets on the side of the column
and tighten to a torque of 25Nm (5) using a drill with an 8Ø bit.

Position the lift pedal with sheathed cables

6.

on the threaded

pins and lock with the nuts provided (6).

Position the pneumatic locking pedal on the

7.

threaded

pins and lock with the nuts provided (7).

Installation