beautypg.com

C.E. Niehoff & Co. N2003 LBCD Installation User Manual

N2003 load and battery control device (lbcd), C. e. niehoff & co

background image

II0033E

Page 1 of 2

N2003 Load and Battery

Control Device (LBCD)

For Use With CEN N1509, N1506-1,

and N1511 Alternators

Installation Instructions

C. E. Niehoff & Co.

BRUSHLESS ALTERNATORS

1. Install N2003 LBCD in location specified by

vehicle manufacturer. Torque mounting hardware
to 3.39 Nm/30 lb. in. See Figure 2 on page 2.

Do not exceed recommended
torque. Component damage
will result.

This symbol is used to indicate the
presence of hazards that can cause
minor personal injury or equipment
damage.

CAUTION

2. Jam nuts must be in position and tightened to

specifications before installing remaining cables
and hardware.Connect cables as shown in Figures 1
and 2 in proper stacking order. Hold jam nuts with
19mm wrench while tightening the 8mm clamping
hex nuts to specifications shown in Figure 2.

Do not exceed recommended
torque. Component damage
will result.

Support cables within 305 mm/
12 in. of LBCD. Failure to
do so can cause component
damage.

3. Simple wiring schematic is shown on page 2.

4. Test components to make sure they operate

properly.

This symbol is used to indicate the
presence of hazards that will cause
severe personal injury, death or
equipment damage.

DANGER

DANGER

DANGER

CAUTION

24 V

FROM

ALTERNATOR

TTTTT TTTTT

24 V

FROM

BATTERY

24 V LOAD

TTTTT

12 V LOAD

TTTTT

12 V

FROM

ALTERNATOR

TTTTT TTTTT

12 V

FROM

BATTERY

Figure 1 - Cable Arrangement (See Wiring Diagram on Page 2)