beautypg.com

Alpha Technologies APB HFC Voltage Booster User Manual

Page 13

background image

13

016-559-B0-001 Rev. A

3. Locate the measuring gauge near port number 1 or 2.

2.0 Installation,

continued

2.3

Cable Preparation, continued

Installation is complete. Go to Power Up and Test (Section 2.7, Power Up and Test).

5. Using heavy duty wire cutters, clip the pin as close to the

line as possible.

4. Place the connector’s collar against the edge of the

measuring gauge molded into the enclosure.