ONLY qualifi ed personal should connect the utility power. Power must be connected in
compliance with local electrical codes, and common safety practices must be observed.
WARNING!
2.0 Installation,
continued
2.3 Connecting Utility Power
•
Connection to utility power must be approved by the local utility before installing the power supply.
•
UL and NEC require that a service disconnect switch (UL listed) be provided by the installer and be
connected between the power source and the Alpha power supply.
•
Connection to the power supply must include an appropriate service entrance weather head.
ATTENTION:
Utility power enters the enclosures through a 1-1/8" (28.6mm) opening in the bottom of the
PME series, and in the rear of the PWE series, or through an optional breaker box. The
enclosures accept a standard electrical fi tting.
A “high-magnetic” trip circuit breaker must be used in order to accommodate the high-inrush
currents normally associated with the start-up of ferroresonant transformers (400A, no-trip,
fi rst-half cycle). Do not replace this circuit breaker with a conventional service entrance circuit
breaker. Alpha recommends Square D circuit breakers for 120V installations, and HACR
(heating and air-conditioning) breakers for 240V installations. Alpha Technologies offers a
high-magnetic Square D circuit breaker and a BBX option (a UL Listed service entrance).
Contact your local sales representative for more information.
Description
Alpha Part Number
Square D Part Number
240V Installation — HACR (15A)
470-224-10
QO215
120V Installation — High-Magnetic (20A)
470-017-10
QO120HM
120V Installation — High-Magnetic (15A)
470-013-10
QO115HM
BBX — External Service Disconnect
020-085-10
QO2-4L70RB
BBX — External Service Disconnect
020-141-10
QO8-16L100RB
Table 2-1, Service Entrance Circuit Breaker Requirements
Alpha recommends 12AWG wiring to accommodate a 90V power supply.
NOTE: