0 installation, Enclosure front – Alpha Technologies AlphaGen PN-6x-T 7.5kW 48VDC - Installation and Operation Manual User Manual
Page 26

26
745-020-B0-003, Rev. C
3.0 Installation
Prior to installation verify the following:
•
All necessary grounding rods and materials are in place.
•
Utility power was run to site in accordance with the NESC (National Electric Safety Code).
•
Obtained local safety practices for working with high-voltage systems.
•
Gas piping, hardware, supports, and other gas carrying components to the pad location conform
to NFPA standard and local requirements.
Required Tools and Materials:
•
Crane to lift enclosure from shipping pallet and place on pad
•
Key(s) to enclosure doors
• Digital
voltmeter
•
Torque wrench with insulated handle and 7/16" socket
•
7/16” box-end wrench
•
NO-OX or other suitable corrosion inhibiting agent (NCP-2)
•
Silicone sealant GE RTV123 (or equivalent)
•
Phillips screwdriver (for pad shear mounting)
•
5/8" socket for removing pallet mounting bolts
• Hard
hats
• Utility
knife
MOUNTING STUD POSITION
O
0.625 x 1.000 4 PL
ENCLOSURE
FRONT
26.00
O
0.875
GROUND SWEEP
O
3.000
DC SWEEP
O
1.375
AC SWEEP
0.25
3.00
5.35
5.60
7.60
0.581
3.40
Fig. 3-1, Sweep Dimensions (in inches)