0 installation, continued – Alpha Technologies FBE2322 Enclosure System User Manual
Page 28

28
031-314-B0-001, Rev. A (12/2012)
2.0 Installation, continued
2.9 Equipment Installation, FBE2322-ENCBEE
The FBE2322 Enclosure system capabilities may be expanded by adding additional enclosure sub-units.
A standard configuration example for that scenario is shown below. A standard configuration example is
shown below. Consult an Alpha Applications Engineer for more details about approved configurations.
Standard Configuration Cordex in Base Cabinet with additional Battery Enclosure Example:
• AC Power Distribution Shelf
• Cordex™ CXRF-HP 48-1.2kW 19" Front Access Shelf System
- Configured for 120Vac input
- Provides 12.5A @ 48VDC, N+1
- Fully equipped shelf provides 2.4kW (12.5A max @ 48V)
- 2RU shelf
- Heat dissipation <154 BTU/hr, per rectifier module
• Telect Dual Feed 60A GMT fuse panel, 10A/10B position -48VDC
• 10 RU of additional equipment space, or
• BEE provides 12.25" for battery storage
0 RU
5
10
15 RU
0 RU
5
0 RU
5
10
15 RU
0 RU
5
11 RU Additional
Equipment Storage
18.73"
12.25" of
Battery Storage
Standard configuration: Rack
mounted at holes 9 & 10
from front of Enclosure
1 2 3 4 5 6 7 8 9 10
A
15A GMT Fuse Max
Power
Alarm
15A GMT Fuse Max
1 2 3 4 5 6 7 8 9 10
13.24"
Cordex Shelf
System (2RU)
GMT Fuse
Panel (1RU)
AC Power
Distribution (1RU)
Fig. 2-15, FBE2322-ENCBEE Stanrdard Equipment Configuration Example