2.0 Installation, continued

2.6 Ground-mount Installation

Alpha Technologies, Inc. cannot anticipate all the ways a vehicle could threaten an installed system or the

specific type of protection that is appropriate for a particular location. The following installation drawing for

Alpha’s Standby Power systems are general recommendations and not intended to be a specific guideline

for protecting the equipment. The numbers of bollard posts (or other protection devices) depend upon

equipment locations.

Never transport the unit with installed batteries. Doing so can cause injury to the installer or damage

the enclosure and equipment. Install the batteries after you transport the unit to the site and secure

it to the pad.

CAUTION!

ATTENTION:

It is the responsibility of the installer to meet the requirements of all applicable national and local codes. Alpha

Technologies assumes no responsibility or liability for failure of the installer to comply with the requirements of

all applicable local and national codes.

The appropriate grounding method for a particular location depends on soil type, available space, local codes,

NEC (National Electric Code), and other site-specific characteristics.

ATTENTION:

Fig. 2-8, Ground-mount Positioning and Safety Example

PAD

POSTS

SPRINKLER HEAD

SIDEWALK

10’ (3m)