beautypg.com

Save these instructions – Gotham DLWF 6 & 8 User Manual

Page 2

background image

IMPORTANT INSTALLATION INFORMATION
Fixture ships configured for T-grid and standard ¾” drywall. For
thicknesses exceeding ¾” up to 1 ½” inches, adjust mounting bar
brackets by loosening screw through hole (A), sliding bracket to
upper position and tightening through hole (B).

FEED WIRE CONNECTION TO FIXTURE J-BOX Refer to Figure 6
J-box is approved for through wiring with eight No. 12 AWG
conductors (4in/4out), rated 90°C or higher.

1. Remove J-box cover by releasing spring clip (A) at top and

allowing cover (B) to hinge open.

2. Select knockout, remove and install appropriate box connec-

tor.

3. Install feed wire applicable to NEC and/or local requirements.
4. Complete wiring.
5. Reinstall J-box cover (B) and the wiring is complete.

BALLAST REPLACEMENT Refer to Figures 7 & 8

1. Remove trim.
2. Using a ¼” nut driver or flat head screwdriver, loosen two

screws (A) located inside of housing above galvanized frame
aperture.

3. Twist black housing (B) and lift off of galvanized mounting

frame.

4. Through aperture, remove ballast assembly (C), unwire

ballast.

5. Install replacement in reverse order.

Figure 7

Part No. CJ52009
Page 2 of 2 - 5/06

Figure 8

Figure5

NON-STANDARD CEILING THICKNESS
HOUSING INSTALLATION

A

B

Figure 6

SAVE THESE INSTRUCTIONS

A

B

C

C

B