Gotham GRSF Emergency Ballast with Integral or Remote Test Switch User Manual
Installation instructions, Figure 1, Figure 2
IMPORTANT SAFETY INFORMATION
For Your Protection, Read Carefully
WARNING - Risk of fire. Do not install insula-
tion within 3 inches of fixture sides or wiring
compartment, nor above the fixture in such
a manner as to entrap heat.
1. Electric current can cause painful shock
or serious injury unless handled properly.
For your safety, always remember the fol-
lowing:
• Turn off the power supply.
• Ground the fixture to avoid potential
electrical shocks.
• Do not handle an energized fixture or
energize any fixture with wet hands,
when standing on a wet or damp sur-
face, or in water.
• Double check all electrical connections
to be sure they are tight and correct.
2. Specific safety information concerning
lamps:
• Match wattage of fixture and lamp ex-
actly.
• Do not remove or insert lamp when power
is on.
• Do not scratch glass or subject lamp to
undue pressure as either may cause
lamp breakage.
• Protect operating lamp from sources
of moisture.
Upon receipt, thoroughly inspect for any
freight damage which should be brought to
the attention of the delivery carrier. Compare
the catalog description listed on the packing
slip with the label on the carton to ensure you
have received the correct merchandise.
INSTALLATION INSTRUCTIONS
GRSF
Emergency Ballast with
Integral or Remote Test
Switch
Figure 1
Part No. CJ520490
Rev. B 05/04
For Integral Test Switch:
3.
Drop socket housing through rough-
in section opening.
4.
Install integral test switch and reflec-
tor as detailed on separate instruc-
tion sheet.
For Remote Test Switch:
3.
Select location near rough-in section
for mounting junction box (attached
to emergency ballast assembly) that
will house the remote test switch/
charging indicator light cover plate.
Cut hole in ceiling using junction box
as a reference as shown in Figure 2
(approximate size required: 2" x 3
1
/
4
").
Secure junction box in hole.
IMPORTANT: Before cutting hole,
verify that junction box will reach
preferred location and will not inter-
fere with any part of the rough-in
section.
4.
Remote test switch/charging indica-
tor light cover plate may now be in-
stalled by aligning plug connector
with mating connector inside junction
box and snapping the two together.
Use screws provided to secure cover
plate to junction box.
IMPORTANT: When connectors are
plugged together, the fixture circuit
is completed. If power to fixture is
turned off, the batteries inside the
emergency ballast assembly will dis-
charge. Frequent power interrup-
tions may result in premature failure
of the batteries.
Figure 2
T
R
A
H
C
G
N
I
T
O
O
H
S
E
L
B
U
O
R
T
n
i
m
e
l
b
o
r
p
e
h
t
e
t
a
c
o
l
,
n
o
it
i
d
n
o
c
d
o
o
g
n
i
m
e
e
s
y
e
h
t
fI
.
e
l
u
d
o
m
n
i-
e
m
a
r
f
r
o
p
m
a
l
e
h
t
o
t
e
g
a
m
a
d
e
l
b
i
s
i
v
y
n
a
r
o
f
k
c
e
h
C
.
s
n
o
it
c
a
e
v
it
c
e
r
r
o
c
d
n
a
s
e
s
u
a
c
e
l
b
i
s
s
o
p
f
o
t
s
il
g
n
i
w
o
ll
o
f
e
h
t
m
o
t
p
m
y
S
e
s
u
a
C
e
l
b
i
s
s
o
P
n
o
it
c
A
e
v
it
c
e
r
r
o
C
O
T
S
L
I
A
F
P
M
A
L
T
H
G
I
L
d
e
z
i
g
r
e
n
e
t
o
n
e
r
u
t
x
if
e
h
t
g
n
i
d
e
e
f
ti
u
c
r
i
C
·
n
o
it
c
e
n
n
o
c
e
l
u
d
o
m
r
o
ti
u
c
r
i
c
n
i
r
o
r
r
e
g
n
i
r
i
W
·
p
m
a
l
y
tl
u
a
F
·
t
u
p
t
u
o
t
s
a
ll
a
b
r
o
e
n
i
L
·
t
s
a
ll
a
b
y
tl
u
a
F
·
w
o
l
o
o
t
e
r
u
t
a
r
e
p
m
e
t
t
n
e
i
b
m
A
·
.
d
e
z
i
g
r
e
n
e
s
i
ti
u
c
r
i
c
t
a
h
t
e
r
u
s
n
e
o
t
e
s
u
f
r
o
r
e
k
a
e
r
b
ti
u
c
r
i
c
k
c
e
h
C
·
e
r
a
s
n
o
it
c
e
n
n
o
c
t
a
h
t
e
r
u
s
n
e
o
t
x
o
b
e
c
il
p
s
e
r
u
t
x
if
e
n
i
m
a
x
E
·
.t
c
e
r
r
o
c
y
l
b
a
r
e
f
e
r
p
,
p
m
a
l
r
e
h
t
o
n
a
e
t
u
ti
t
s
b
u
s
d
n
a
p
m
a
l
y
tl
u
a
f
e
h
t
e
v
o
m
e
R
·
l
a
n
i
g
i
r
o
e
h
t
e
c
a
l
p
e
r
,
s
t
h
g
il
p
m
a
l
e
h
t
fI
.t
h
g
il
o
t
n
w
o
n
k
s
i
t
a
h
t
e
n
o
.
e
n
o
w
e
n
a
h
ti
w
.
e
g
a
tl
o
v
ti
u
c
r
i
c
n
e
p
o
k
c
e
h
C
.
e
r
u
t
x
if
t
a
e
g
a
tl
o
v
e
n
il
k
c
e
h
C
·
.
y
ti
u
n
it
n
o
c
ti
u
c
r
i
c
k
c
e
h
C
·
.
s
n
o
it
i
d
n
o
c
l
a
t
n
e
m
n
o
r
i
v
n
e
g
n
it
s
i
x
e
t
s
n
i
a
g
a
g
n
it
a
r
t
s
a
ll
a
b
k
c
e
h
C
·
T
U
O
S
E
O
G
P
M
A
L
G
N
I
T
H
G
I
L
R
E
T
F
A
p
m
a
l
y
tl
u
a
F
·
n
a
h
t
r
e
h
t
a
r
m
o
t
p
m
y
s
s
i
h
t
ti
b
i
h
x
e
ll
i
w
p
m
a
l
a
y
ll
a
n
o
i
s
a
c
c
O
·
.
p
m
a
l
w
e
n
a
e
t
u
ti
t
s
b
u
S
.t
h
g
il
o
t
g
n
il
i
a
f
y
l
p
m
i
s
N
O
S
E
L
C
Y
C
P
M
A
L
F
F
O
D
N
A
e
r
u
t
x
if
o
t
e
s
o
l
c
o
o
t
s
i
n
o
it
a
l
u
s
n
I·
h
g
i
h
o
o
t
e
g
a
t
t
a
w
p
m
a
L
·
w
o
l
e
g
a
tl
o
v
t
u
p
t
u
o
t
s
a
ll
a
B
·
)
"
3
t
s
a
e
l
t
a
(
e
l
u
d
o
m
d
n
u
o
r
a
m
o
r
f
n
o
it
a
l
u
s
n
i
e
v
o
m
e
R
·
.
g
n
i
s
u
o
h
n
i
d
e
if
i
c
e
p
s
e
g
a
t
t
a
w
p
m
a
l
ll
a
t
s
n
I·
.
e
g
a
tl
o
v
ti
u
c
r
i
c
n
e
p
o
k
c
e
h
C
.
e
r
u
t
x
if
e
h
t
t
a
e
g
a
tl
o
v
e
n
il
k
c
e
h
C
·
Figure 2
Prior to Installation
1.
Install rough-in section as de-
tailed on separate instruction
sheet.
2.
Determine line voltage to fixture
(switched and unswitched
power requirements).
3.
Verify correct ballast/lamp com-
bination.
Installation
1.
Pivot emergency ballast assem-
bly onto mounting rails of rough-
in section as shown in Figure 1.
Make any necessary vertical
adjustments to assure that the
bottom of the rough-in section is
flush or slightly above (1/8" max.)
the ceiling line.
2.
Feed power supply to fixture as
detailed in separate instruction
sheet. Attach flex with junction
box cover from Emergency Bal-
last assembly to junction box
and make necessary wire con-
nections.