Gotham Evo_Incito Flangeless Round & Square User Manual
Save these instructions, Evo/incito flangeless round & square
INSTALLATION INSTRUCTIONS
Evo/Incito Flangeless
Round & Square
IMPORTANT SAFETY INFORMATION
For Your Protection, Read Carefully
WARNING - Turn of all power prior to beginning
any installation or maintenance of this fixture.
RISK OF FIRE. THIS FIXTURE IS NON I/C
RATED, NOT FOR USE WITH INSULATION.
Do not install insulation within 3 inches of fixture
sides or wiring compartment, nor above the
fixture in such a manner as to entrap heat.
CJ5200914 Rev. A
©2010 Acuity Brands Lighting, Inc.
All Rights Reserved.
1 of 2
1. Electric current can cause painful shock or
serious injury unless handled properly. For
you safety, always remember the following:
•Turn off the supply power.
•Ground the fixture to avoid potential electrical
shocks.
•Do not handle an energized fixture or
energize any fixture with wet hands, when
standing on a wet or damp surface, or in
water.
2. Specific safety information concerning
lamps:
•Match wattage of fixture and lamp exactly.
•Do not remove or insert lamp when power is
on.
•Do not scratch glass or subject lamp to
undue pressure as either may cause lamp
breakage.
•Protect operating lamp from sources of
moisture.
• If lamp is marked it contains
mercury. Follow disposal laws. See:
www.lamprecycle.org.
SAVE THESE INSTRUCTIONS
Upon receipt, thoroughly inspect for any freight
damage which should be brought to the
attention of the delivery carrier. Compare the
catalog description listed on the packing slip with
the label on the carton to ensure you have
received the correct merchandise.
PRIOR TO INSTALLATION
Read and familiarize yourself with the nomenclature and instructions before starting
installation.
Turn off electricity at the breaker panel or fuse box and follow National Electrical Code
regulations and applicable local building codes.
1.
Install housing based on mounting frame installation instructions. Ensure mounting
rails are level. Bottom edge of mounting frame should be flush with bottom of ceiling
(see Figure 1).
2.
For EVO FL (Round) installation, remove and discard the light engine yoke (see Figure
1).
3.
Apply a generous amount of joint compound to the ceiling where the mudring will
install (see Figure 2). Install mudring to ceiling pressing firmly. Smooth mud on front
side. Allow to dry. (Construction adhesive may also be used to install mudring to
ceiling but be sure to wipe off any excess adhesive from the front side of the mudring
with a disposable towel.) For EVO FL (Round) installation, be sure to install the
mudring so that the notches are 180° apart and are aligned vertically with the
torsion spring brackets on the housing frame (See Figure 3). This is imperative
to allow the installation of the finishing trim.
Figure 1
Figure 2
Figure 3