Installation and operation, Installation overview, Mounting the ipl t cr48 – Extron Electronics IPL T CR48 User Manual
Page 9: Installation overview mounting the ipl t cr48
![background image](/manuals/311930/9/background.png)
Installation and
Operation
This section describes the installation and the operation of the IPL T CR48. Topics that are
covered include:
z
z
z
z
z
z
Rear Panel Features and Cabling
z
z
Installation Overview
To install and set up the IPL T CR48, follow these steps:
1.
Turn all of the equipment off. Make sure that the input devices (such as motion
detectors and alarms), the IPL T CR48, and the output devices (such as projectors or
screen lifts) are all turned off and disconnected from the power source.
2.
Mount the IPL T CR48 unit (see
).
3.
Configuration” section.
4.
Connect power cords and turn on the devices in the following order: output devices
(projector lifts, screen lifts, lighting system, and so on), IPL T CR48, serial controller or
computer (PC), then input devices (DSS, cable boxes, and so on).
5.
Configure the IPL T CR48 through Telnet, then access the unit using an Internet browser.
Mounting the IPL T CR48
Optional rack shelves and an assortment of mounting kits (furniture and projector mount)
are available for use with the IPL T CR48 controller. See the
section for the part numbers of these accessories. Read the instructions provided
with the rack shelf or mounting kit for installation procedures.
The IPL T CR48 includes rubber feet so that it can be set on a table. If you are going to
mount the unit to a rack shelf, furniture, or pole, and these feet were attached to the
controller, remove the feet before mounting.
IPL T CR48 • Installation and Operation
3