beautypg.com

3 commissioning, 1 preparing the logger, Commissioning – Xylem WQL-pH pH DATALOGGERS User Manual

Page 11: Preparing the logger 3.1.1, 3commissioning

background image

WQL-pH

Commissioning

85

ba75821e01

10/2009

3

Commissioning

3.1

Preparing the logger

3.1.1

General information on the installation of the battery and
electrode

z

Normally, all screw joints of the logger housing can be opened and closed
by hand, without using any tools. If necessary, use a paper towel so you
get a better grip on the parts.

z

Install the battery and electrode in a clean and preferably dry environment.
Moisture in the screw joint can affect the functioning of the logger.

Note
Please follow additionally the notes on commissioning in the operating
manual of the electrode.