Testing, Installation complete – Bell & Gossett HS 213B Series B2 Inverted Bucket Steam Trap Service Parts User Manual
Page 8
8
d. Slowly open the shut-off valve (A) on the inlet
side of the trap.
B
e. Prime the bucket trap as follows while the
equipment is operating:
1. Close the shut-off valve (B) on the outlet
side of the trap for (1) one minute.
2. Slowly open the shut-off valve (B) on the
outlet side of the trap.
c. Open the shut-off valve (B) on the outlet side of
the trap.
b. If a gate valve (C) for test and pressure relief
is installed and it is open, close it.
C
A
B
INSTALLATION COMPLETE
a. Inspect joints for leaks. Stop all leaks by
tightening bolts (E) or replace gasket, if
necessary.
E
(x6)
INSTALLATION COMPLETE
TESTING
This manual is related to the following products: