beautypg.com

Extension column installation – Peerless-AV PAG-UNV-HD - Installation User Manual

Page 7

background image

7 of 27

ISSUED: 08-13-09 SHEET #: 056-9023-7 09-10-12

Extension Column Installation

Hand thread extension column into ceiling place (

B).

Align notch of extension column with one of the four

holes in ceiling plate (

B) and secure with an

M5 x 10 mm socket pin screw (

K) using allen wrench

(

O) as shown in detail 2.

Hand thread column connector (

C) onto extension

column. Align slot in extension column with one of

the top holes of the column connector (

C). Insert

and tighten one #10-32 x 3/8" socket pin screw (

P)

through column connector (

C) into slot of extension

column using 4 mm security allen wrench (

O) as

shown in detail 3.
Hand thread projector mount assembly (

A) into

column connector (

C). Align slot of projector mount

assembly (

A) with one of the bottom holes in column

connector (

C). Insert and tighten one #10-32 x 3/8"

socket pin screw (

P) through column connector into

projector mount assembly using 4 mm security allen

wrench (

O) as shown in detail 4.

NOTE: Slotted set screws (N) are used to jam

against the threads of each connecting joint to

prevent any excess movement. Do not overtighten

screw. Overtightening screw will damage threads

making it difficult to separate components.

3

fig. 3.1

DETAIL 2

DETAIL 3

DETAIL 4

P

N

N

P

C

A

EXTENSION

COLUMN (SOLD

SEPARATELy)

(UL LISTED EXT

OR ADJ SERIES)

K

N