Grain Systems PNEG-1935 User Manual
Page 20

4. Boot Screen
20
PNEG-1935 Vision Hybrid for Portable Dryers
8. Select the program file you wish to upload by touching the “Move Up” and “Move Down” buttons until
the desired program file is highlighted. Then, choose the “Accept/Exit” button.
9. Touch the “Start Upload” button.
10. When the “Upload Progress” screen appears, select the “Start Upload” button.
Figure 4H
11. The Vision computer will now begin programming each of the network circuit boards on the dryer.
The box on the right of the screen lists the network circuit boards detected in the scan. Each circuit
board listed will have to be reprogrammed, so this may take a few minutes. File upload progress for
the circuit board that is highlighted is displayed in the box on the left.
12. Once the upload is complete, choose the “Exit to Dryer” button to leave the “Boot Loader” screen and
start the dryer.
13. The dryer will begin running the program that was just installed.
14. The dryer control is now ready to operate the dryer.
15. In the event it is determined that reversion to the previous software version is necessary, go back to
the Boot Screen and select “Install Dryer Software” and follow the instructions above to re-install the
previous software.