beautypg.com

5 switch-on phase – VEGA VEGABAR 82 Modbus and Levelmaster protocol - Operating Instructions User Manual

Page 27

background image

27

5 Connecting to power supply and bus system

VEGABAR 82 • Modbus and Levelmaster protocol

46294-EN-131107

+

+

power supply

MODBUS

D0

D1

IS GN

D

USB

1

2

4

3

1

3 4 5

2

off on

( )

(

)

(-)

(-)

Fig. 25: Connection compartment
1 USB interface

2 Slide switch for integrated termination resistor (120 Ω)

3 Voltage supply

4 Modbus signal

Terminal

Function

Polarity

1

Voltage supply

+

2

Voltage supply

-

3

Modbus-Signal D0

+

4

Modbus-Signal D1

-

5

Function ground with installa-

tion according to CSA

5.5 Switch-on phase

After connecting the instrument to power supply or after a voltage

recurrence, the instrument carries out a self-check for approx. 10 s:

Internal check of the electronics

Indication of the instrument type, hardware and software version,

measurement loop name on the display or PC

Indication of a status message on the display or PC

The output signal jumps to the set fault current

Then the actual measured value is outputted to the signal cable. The

value takes already carried out settings, e.g. default setting into ac-

count.

Connection compartment