Veris Technologies 3100 Soil EC Mapping System (1997-2008 floppy disk drive 1.76G) - Operating Instructions User Manual
Page 6

Veris Technologies
Pub. #OM 1CM02-1
6
Support here
3) Install tongue with two 5/8’ X 41/2” bolts and torque to 170 ft lbs
Prior to operating the implement for the first time, it is important to check the following:
1) All fasteners – some may have loosened during shipment.
2) Coulter electrode isolation – check so see that no metal part of the any coulter
electrode is in contact with the implement frame. This may be by visual inspection or by
connecting one lead of an ohmmeter to the individual coulter electrode, and the other to a
grounded fastener on the frame. If the coulter electrode is properly isolated, no reading
will be obtained. Make sure that all electrode coulter clamp bolts are properly tightened to
prevent lateral movement of the coulter electrode.