3. Installation

User Guide

Page 3-7

3.2.2 Powering Off

If you need to power off the entire system, such as when switch or RAID system requires

firmware updates, adding a RAID system or client computer, power off in the reverse

order of Powering On. Before turning off SWF16, turn off the all the client computers first.

Wait for complete client computers to shut down and then the SWF16, then the ExaSAN

storage systems.

During RAID initiation or disk drive rebuilding, you can turn off the client computers only

and leave the SWF16 and storages powered on.

Figure 26: power off sequence

3.3 Installing the Installer Package

3.3.1 Before You Start

Before the installer package can be installed on Windows, Mac, and Linux platforms,

makes sure you have completed the following:

Setup your ExaSAN storage completely. Please refer to the ExaSAN storages’ user

manual.

Install the HBA card to your host server. Please refer to Section

3.1.1

, “Installing HBA

Card”.

Connect the QSFP cable between ExaSAN storages and SWF16. Please refer to

Section

3.1.2

, “Connecting SWF16 to the ExaSAN storages”.

Connect the QSFP cable between SWF16 and the host server. Please refer to

Section

3.1.3

, “Connecting SWF16 to the Host systems”.

Connect the switch LAN cable and power cord. Please refer to Section

3.1.4

,

“Connecting the switch LAN and power cord”.

Power on the ExaSAN storages, SWF16 and the host server in the correct sequence.

Please refer to Section

3.2.1

, “Powering On”.