Preparing to install exasan swf16, 1 precaution for handling the system, 2 choosing the location for the system – Accusys ExaSAN SWF16 User Manual
Page 30: 3 electrical power, Precaution for handling the system, Choosing the location for the system, Electrical power

2. Preparation
User Guide
Page 2-1
2. Preparing to Install ExaSAN SWF16
To ensure safe and smooth operation of your ExaSAN SWF16, it is essential that you
choose an appropriate location for the system, and provide an appropriate operating
environment and adequate power for all components of the system. As you plan for
installation, follow the guidelines below to ensure that the system and its environment
are safely and appropriately positioned for efficient operation and service.
2.1 Precaution for Handling the System
Take the following precautions to avoid damage to the system or potential injury to
you.
1. Prepare a flat, sturdy surface before removing the system from its packaging. The
table or cart that will hold the system should be as close as possible to the system’s
carton.
2. Ensure that all power switches have been turned off and all power cords
disconnected to prevent personal injury and damage to the hardware.
3. Static electricity can damage electronic components of your system. Follow the
guidelines below to avoid such damage:
a. Work in a static-free environment
b. Wear a grounded anti-static wrist strap
c. Store uninstalled components in anti-static bags
d.
2.2 Choosing the Location for the System
Handle circuit boards by their edges and avoid touching chips and
connectors
The ExaSAN SWF16 is designed as a rack-mount solution. Depending on where your rack
is located, you should keep the following points in mind when determining where to
place your system.
1. Measure the amount of available space in the rack. The amount of space required
for the SWF16 is 1U rack space. (dimensions are L410mm x W447/480.2mm x
H43.8mm)
2. Measure the distance between any two components that need to be connected
via cable(s). This measurement will help you determine the length of the required
cable(s). Or if you’ve already purchased the cables, determine the proximity of the
components in question.
3. Leave sufficient room, at least two inches, around the unit to allow air ventilation.
4. Do not block or cover any of the ventilation holes in the front and back panels of
the unit. Consistent airflow is essential to keeping the system operating efficiently.
5. Allow additional room at the front and back of the unit for service.
6. The ExaSAN SWF16 uses several cables and cords. It’s a good idea to determine
how they will be arranged at the rear of the system, and where the cables will be
routed to connect to the host systems and RAID disk systems.
2.3 Electrical Power
At your chosen location for the ExaSAN SWF16, make sure that the electrical circuitry
and power outlets are sufficient for the combined power needs of all hardware