beautypg.com

Unit dimensions, Zj/zr unit dimensions front view, Utilities entry – York 251934-YTG-J-0910 User Manual

Page 98

background image

251934-YTG-J-0910

98

Johnson Controls Unitary Products

Unit Dimensions

ZJ/ZR Unit Dimensions Front View

NOTE: All entry holes should be field sealed to prevent rain water

entry into the building.

11-1/2

(A) CONTROL WIRING

ENTRY

COIL

GUARD

KIT

CONDENSER

COILS

(B) POWER

WIRING

ENTRY

5

9-3/4

21.00

6-3/8

7-1/8

35

5-7/8

136-1/4

GAS OR ELECTRIC
HEAT
ACCESS

DOT PLUG

(For pressure

drop reading)

BLOWER

COMPARTMENT

ACCESS

(Auxiliary)

(C) GAS

SUPPLY

ENTRY

CONTROL BOX

ACCESS

VENT AIR

OUTLET

HOODS

BLOWER MOTOR
ACCESS (Location
of Optional VFD Bypass)

BLOWER ACCESS
(Location of
Optional VFD)

52-5/8

180-19/32

COMPRESSOR ACCESS

DISCONNECT

SWITCH

LOCATION

ECONOMIZER / MOTORIZED DAMPER

FIXED OUTDOOR INTAKE AIR AND

POWER EXHAUST RAIN HOODS

(See detail Y)

92

46-5/8

35-1/4

33

2-3/4

3-3/4

(B) POWER WIRING

ENTRY

BOTTOM SUPPLY

AND RETURN

AIR OPENINGS

(See Note)

(A) CONTROL WIRING

ENTRY

21-1/2

11-1/8

(D)

GAS SUPPLY

ENTRY

UNIT BASE RAILS
Shown separately to illustrate

RETURN

AIR

Bottom Duct openings. Power
and Gas Piping Connection
location.

NOTE:
For curb mounted units, refer to the curb hanger
dimensions of the curb for proper size of the
supply and return air duct connections.

12-1/2

9-1/4

8-1/8

46-5/8

9-3/4

COMBUSTION

AIR INLET HOOD

SUPPLY

AIR

Utilities Entry

Hole

Opening Size

Diameter

Used For

A

1-1/8” KO

Control Wiring

Front

3/4” NPS (Fem.)

Bottom

B

3-5/8” KO

Power Wiring

Front

3” NPS (Fem.)

Bottom

C

2-3/8” KO

Gas Piping (Front)

1

1. One-inch Gas Piping NPT Required.

D

1-11/16” Hole

Gas Piping (Bottom)

1,2

2. Opening in the bottom to the unit can be located by the slice in the

insulation.