beautypg.com

10 unit roof curb dimensions, 11 roof curb duct openings dimension – York DM 300 User Manual

Page 35

background image

262259-YTG-E-1008

Johnson Controls Unitary Products

35

1.

The 2” space between the ducts allows for “jumping” an
existing roof joist.

2.

The 58-1/2” overall dimension of the ducts allows duct-
work penetration between roof joists that are spaced on
72” centers.

NOTE: Ducts can be installed into the curb from the roof. All

electrical and gas line connections can be made
inside the curb.

FIGURE 10 -UNIT ROOF CURB DIMENSIONS

SUPPLY AIR*

BACK OF UNIT

RETURN AIR*

DUCT SUPPORT RAILS

MIN. ROOF OPENING:
39-7/8" WIDE X 61-7/8" Long

OUTDOOR COIL
END OF UNIT

4"

33-1/8"

2"

22-3/4"

4"

4"

84"

35-7/8"

14-1/4" (15 Ton)
25-1/4" (20, 25 Ton)

115-5/16" (15 Ton)
126-1/4" (20, 25 Ton)

2"

*Supply and Return Air (including duct support rails)
as shown, are typical for bottom duct applications.

For location of horizontal duct applications
(on back of unit), refer to Unit Dimension details.

FRONT

OF

UNIT

DUCT SIZES:
Supply Air = 22-1/2" x 35-5/8"
Return Air = 32-7/8" x 35-5/8"

FIGURE 11 -ROOF CURB DUCT OPENINGS

DIMENSION

This manual is related to the following products: