beautypg.com

Prepare boiler location — vent system, Gold cgs gas-fired water boiler — boiler manual, Cgs special vent system – Weil-McLain GOLD CGS 550-110-260/0107 User Manual

Page 8

background image

Part number 550-110-260/0107

8

GOLD CGs Gas-Fired Water Boiler — Boiler Manual

Prepare boiler location — vent system

1c

Failure to follow all instructions can result in flue gas spillage and carbon monoxide emissions, causing severe

personal injury or death.

When removing boiler from an
existing common vent system:

At the time of removal of an existing boiler, the fol-

lowing steps shall be followed with each appliance

remaining connected to the common venting system

placed in operation, while the other appliances remain-

ing connected to the common venting system are not

in operation.
a.

Seal any unused openings

in the common venting

system.

b.

Visually inspect the venting system

for proper

size and horizontal pitch and determine there is no

blockage or restriction, leakage, corrosion or other

deficiencies which could cause an unsafe condi-

tion.

c.

Test vent system

— Insofar as is practical, close all

building doors and windows and all doors between

the space in which the appliances remaining con-

nected to the common venting system are located

and other spaces of the building. Turn on clothes

dryers and any appliance not connected to the com-

mon venting system. Turn on any exhaust fans, such

as range hoods and bathroom exhausts, so they will

operate at maximum speed. Do not operate a sum-

mer exhaust fan. Close fireplace dampers.

d.

Place in operation

the appliance being inspected.

Follow the lighting/operating instructions. Adjust

thermostat so appliance will operate continuously.

e.

Test for spillage

at draft hood relief opening after

5 minutes of main burner operation. Use the flame

of a match or candle.

f. After it has been determined that

each appliance

remaining connected to the common venting system

properly vents when tested as outlined above, return

doors, windows, exhaust fans, fireplace dampers,

and any other gas-burning appliance to their previ-

ous conditions of use.

Any improper operation of common venting system

should be corrected so the installation conforms with

the National Fuel Gas Code, ANSI Z3.1-latest edition.

Correct by resizing to approach the minimum size as

determined using the appropriate tables in Part 11 of

that code. Canadian installations must comply with

B149.1 or B149. Installation Code.

CGs special vent system

Vent system

The CGs boiler requires a special vent system, designed

for pressurized venting. Model CGs-3 is rated ANSI

Z1.13

Category IV

(pressurized vent, likely to condense

in the vent). Models CGs-4, -5 and -6 are rated Z1.13

Category III

(pressurized vent).

You may use any of the vent systems covered by the

CGs Venting Supplements included in the envelope as-

sembly. The CGs vent starter is a special item, designed

only for the CGs boiler, available from each vendor. Do

not attempt to connect the vent to the CGs boiler with

any other means.

DO NOT

mix components from

different systems. The vent system

could fail, causing leakage of flue

products into the living space.

Vent termination and combustion air
supply

The CGs boiler may be vented through the roof or

through a side wall. Follow the appropriate vent supple-

ment for the vent system chosen. The maximum vent

length depends on boiler size. Refer to the vent supple-

ment to determine acceptable vent length.
Combustion air for the CGs boiler may be from in-

side or ducted directly to the boiler from outside. For

outside air (direct vent installation), two options are

available for the flue/air termination. The air supply

must

ALWAYS

terminate at the same location as the

flue, using either:
1.

Vertical direct vent

installation. Obtain the

Weil-McLain

Through-Roof or Through-Unused

Chimney

termination kit and supplement. Refer

to

Vertical Direct Venting

Venting Supplement,

packed with the kit, and to the vent manufacturer’s

instructions for the vent material chosen.

.

Sidewall direct vent

installation. Use the

Vent/Air

Intake

termination kit shipped with the boiler. Refer

to

CGs Direct Venting: Sidewall & Direct Exhaust

Venting: Vertical or Sidewall

Venting Supplement

shipped with the boiler.

DO NOT COMMON VENT

— Do not install the CGs into a common vent with any other appliance. This will

cause flue gas spillage or appliance malfunction, resulting in possible severe personal injury, death or substantial

property damage.

Inspect existing chimney before installing boiler. Failure to clean or replace perforated pipe or tile lining will cause

severe personal injury or death.