beautypg.com

Initial start-up checklist – TurboChef Technologies 3240 User Manual

Page 18

background image

This form must be completed in its entirety and submitted to TurboChef to activate the warranty and ensure

proper operation. In the case of a multiple oven installation, a “Start-Up Checklist” form must be completed

for

each oven

, noting its position in the stacked confi guration.

-Scanning/emailing to: [email protected]
-Mailing to: TurboChef

Attn: Warranty Department

4240 International Parkway Suite #105

Carrollton, TX 75007

-Faxing to: 214-379-6085

Before attempting to install the oven, ensure all utilities are complete and ready for fi nal connection and

operation. If any of the requirements listed below are incomplete, notify the responsible party to remedy the

condition. The oven must be fully operational and tested before fi nalizing this document.

You may submit this form by either:

• Gas Volume: Maximum input per cavity 85k BTU
(25kW [Gross])
• Gas Pressure (Nat and LP): 6” W.C. (152.4 mmH

2

O)

(14.94 mb) min, 14” (350.6 mm H

2

O, 34.87 mb) max

Requirements:

• Gas Shut-Off Valve Size: A minimum .75 inch (19.05
mm) I.D. full fl ow valve is required for single ovens.
A minimum 1 inch (25.4 mm) I.D. full fl ow valve is
required for double or triple ovens.
• Ventilation: Operable at the time of this Start-Up

NOTE:

It is the recipient’s responsibility to report to the freight company any concealed or non-concealed

damage. Check the oven, attachments, installation kit, and oven shipping container for damage. The freight

company must be notifi ed of any claims

IMMEDIATELY

.

NOTE:

It is the technician’s responsibility to understand and have available for reference the instructions listed

in the Installation Manual, attached to this form. The manual contains crucial information regarding proper

set-up and operation.

Initial Start-Up Checklist

START-UP

14

Power Specifi cations

Electrical

Gas

-Volume: Maximum input per cavity

85k BTU (25kW [Gross])

-Min. Pressure (Nat, LP, I

2H

, I

2E

, I

2E+

, I

2L

, and I

3P

):

6” W.C. (152.4 mm H2O / 14.94 mb)

-Max. Pressure (Nat, LP, I

2H

, I

2E

, I

2E+

, I

2L

, and I

3P

):

14” W.C. (350.6 mm H2O / 34.87 mb)

-Burner Pressure (Nat, LP, I

2H

, I

2E

, I

2E+

, and I

3P

):

3.5” W.C. (88.9 mm H

2

O / 8.71 mb)

-Burner Pressure (I

2L

):

4.0” W.C. (101.6 mm H

2

O / 9.96 mb)

North America

EU/Asia

Phase

1 Phase

1 Phase

Voltage

208/240 VAC

220-240 VAC

Frequency

50/60 Hz

50/60 Hz

Current Draw

8 Amp

8 Amp

Supply

3 Wire

(L + L + G)

3 Wire

(L + L + G)

Breakers

20 amp

16 amp

Plug

NEMA L620

IEC, 309 3 PIN