beautypg.com

Operation, Opera tion – Tiger NEW HOLLAND T6000 User Manual

Page 77

background image

OPERATION

Saber

Operation Section 3-11

©2012 Alamo Group Inc.

OPERA

TION

BOOM ARM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts, nuts and rollpins are properly
installed.

Check condition of bushings at boom pivot
points and hydraulic cylinder tangs.

Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-B- 0022_D

Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running.

(SG-20)

HYDRAULIC LINE INSPECTION

Check for hydraulic leaks along hoses,
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.

Inspect the condition of the valve mounting.

Ensure fittings are properly connected.

OPS-B- 0023_D

Do not operate this Equipment with hydraulic oil or fuel leaking. Oil
and fuel are explosive and their presence could present a hazard. Do
not check for leaks with your hand! High-pressure oil streams from
breaks in the line could penetrate the skin and cause tissue damage
including gangrene. To check for a hose leak, SHUT the unit ENGINE
OFF and remove all hydraulic pressure. Wear oil impenetrable gloves,
safety glasses and use Cardboard to check for evidence of oil leaks. If
you suspect a leak, REMOVE the HOSE and have it tested at a Dealer.
If oil does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure.

(SG-15)