beautypg.com

Assembly, Saber hose routing – Tiger NEW HOLLAND T6000 User Manual

Page 57

background image

ASSEMBLY

Assembly Section 2-25

SABER HOSE ROUTING

WARNING NOTE:

The sudden release of hydraulic pressure could cause the sudden

movement of very heavy parts. Anyone in the way of these parts could be severely hurt or killed.
DO NOT ALLOW these hydraulic hoses to BREAK or BURST in order to prevent hydraulic failure
Make sure the hoses do not pinch or stretch as boom moves. Measure TWICE, check TWICE
then proceed with caution.

Connect the hoses to the preformed tubes and move the boom arm to the farthest forward

position. Arrange the hoses in the clamp as shown in the illustration above, with the 1” motor
hoses to the outside, and loosely connect to the swivel. Next, make sure there is enough slack
for all hoses to pivot at the joint where the main boom arm bends in the swivel, as shown in the
next image, and tighten the hoses in the clamp.

(ASM-SBR HOSE ROUTING-0001)