beautypg.com

Installation, Dura-flue vertical termination – Regency FIREGENIE FG39-NG User Manual

Page 14

background image

14

Regency FG39 FireGenie Freestanding Gas Stove

Diagram 11: The upper half of the flashing is

installed under the roofing material and not

nailed down until the chimney is installed.

This allows for small adjustments.

4) Assemble the desired lengths of black pipe

and elbows necessary to reach from the

appliance adaptor up though the Round

Support Box. Insure that all pipes and

elbow connections are in the fully twist-

locked position and sealed.

5) Cut a hole in the roof centred on the small

drilled hole placed in the roof in Step 2. The

hole should be of sufficient size to meet the

minimum requirements for clearance to com-

bustibles of 1-1/4" (32mm) . Slip the flashing

under the shingles (shingles should overlap

half the flashing) as per diagram 11.

Diagram 12

7) Ensure flue is vertical and secure the base

of the flashing to the roof with roofing rails,

slide storm collar over the pipe section and

seal with a mastic.

8) Install the vertical termination cap by twist

locking it.

6) Continue to assemble pipe lengths.

Note: If an offset is necessary in the attic

to avoid obstructions, it is impor-

tant to support the flue pipe every

3 feet, to avoid excessive stress

on the elbows, and possible sep-

aration. Wall straps are available

for this purpose. See diagram 7.

Galvanized pipe and elbows may be uti-

lized in the attic as well as above the

roofline. The galvanized finish is desirable

above the roofline due to its higher corro-

sion resistance.

Continue to add pipe sections through the

flashing until the height of the flue cap

meets the minimum height requirements

specified in diagram 12 or local codes. Note

that for steep roof pitches, the vertical

height must be increased. A poor draft, or

down drafting can result from high wind

conditions near big trees or adjoining roof

lines, in these cases, increasing the flue

height may solve the problem.

Roof Pitch Minimum Flue Height
Feet Meters
flat to 7/12

2

0.61

over 7/12 to 8/12

2

0.61

over 8/12 to 9/12

2

0.61

over 9/12 to 10/12

2.5

0.76

over 10/12 to 11/12

3.25

0.99

over 11/12 to 12/12

4

1.22

over 12/12 to 14/12

5

1.52

over 14/12 to 16/12

6

1.83

over 16/12 to 18/12

7

2.13

over 18/12 to 20/12

7.5

2.29

over 20/12 to 21/12

8

2.44

Diagram 10

Diagram 9

Diagram 8

Diagram 7

Diagram 6

DURA-FLUE VERTICAL

TERMINATION

1) Maintain the 1-1/4" (32mm)

clearances (air spaces) to

combustibles when pass-

ing through ceilings, walls,

roofs, enclosures, attic rafter,

or other nearby combustible

surfaces. Do not pack air spac-

es with insulation. Check

page 9 for the maximum ver-

tical rise of the fluing system

and the maximum horizontal

offset limitations.

3) To install the Round Support Box/Wall Thim-

ble in a flat ceiling, cut a 10 inch square hole

in the ceiling centred on the hole drilled in

Step 2. Frame the hole as shown in diagram

10.

INSTALLATION

7) Install the Wall Thimble in the center of the

10" square and attach with wood screws.

8) Slide the decorative wall thimble up to the

wall surface being careful not to scratch

the paint and attach with screws provid-

ed. Apply decorative brass or chrome trim

if desired. See diagram 7.

2) Set the gas appliance in its

desired location. Drop a

plumb bob down from the

ceiling to the position of the

appliance flue exit, and

mark the location where

the flue will penetrate the

ceiling. Drill a small hole at

his point. Next, drop a

plumb bob from the roof to

the hole previously drilled

in the ceiling, and mark the

spot where the flue will penetrate the roof.

Determine if ceiling joists, roof rafters or

other framing will obstruct the fluing sys-

tem. You may wish to relocate the appli-

ance or to offset, as shown in diagram 9 to

avoid cutting load bearing members.

This manual is related to the following products: