beautypg.com

Turbo cell, Flow switch – Raypak PS-4 PS-8 User Manual

Page 12

background image

Turbo Cell

The Turbo Cell (used for chlorine generation) should be plumbed AFTER the filter and heater. If installed

on a pool/spa combination system, the cell should be plumbed BEFORE the pool/spa return valve in order

to allow proper chlorination of both the pool and the spa. Refer to plumbing diagram below:

The cell may be mounted vertically or horizontally, and water can move in either direction through the cell.

Install using the 2" unions provided. Tighten unions BY HAND for a watertight seal. For systems with 1

½“ plumbing use adaptors (provided by installer).

Flow Switch

The flow switch must be plumbed in the same section of plumbing as the Turbo Cell. The flow switch is a

safety device that ensures that water is flowing through the cell before the Aqua Logic starts to generate

chlorine. Failure to properly install the flow switch can result in explosive gases accumulating in the pool

plumbing system.

!

IMPORTANT: There must be at least a 12" (30cm) straight pipe run before (upstream)

the flow switch.

If the switch is plumbed after the cell, the cell can by counted as the 12" (30cm) of straight pipe. To ensure

proper operation, verify that the arrow on the flow switch points in the direction of water flow.

9

12”

min

Flow switch before cell

Flow switch after cell