beautypg.com

Installation, Venting arrangement - horizontal terminations, Regency – Regency P121 User Manual

Page 16

background image

Regency

®

P121-2/P121LC-2/P121RC-2/P131-2 Zero Clearance Direct Vent Gas Fireplace

16

VENTING ARRANGEMENT - HORIZONTAL TERMINATIONS

Regency

®

Direct Vent System (Flex) Horizontal Terminations Only

These venting systems, in combination with the P121-2/P121LC-2/P121RC-2/P131-2 Direct Vent Gas Fireplace, have been tested and listed as a
direct vent heater system by Intertek. The location of the termination cap must conform to the requirements in the Vent Terminal Locations diagram
in the "Exterior Vent Termination Locations" section.

Regency

®

Direct Vent (Flex) System Termination Kit (Part# 946-513) includes all the parts needed to install the P121-2/P121LC-2/P121RC-

2/P131-2 with a maximum run of 2 feet. If installing the P121-2/P121LC-2/P121RC-2/P131-2 with a continous vent length of more than 2 ft. (.6m)
to a maximum of 10 ft. (3.0m) use Kit # 946-515 (4 ft.) or 946-516 (10 ft.)

1) 6-7/8" dia. fl exible liner (2 ft. length)
2) 4" dia. fl exible liner (2 ft. length)
3) spring

spacers

(3)

4) thimble

(2)

5) AstroCap termination cap (1)
6) screws

(12)

7) tube of Mill Pac (1)
8) plated

screws

(8)

9) screws #8 x 1-1/2" drill point, stainless steel (4)

Notes:

1) Liner sections should be continuous without any joints or seams.

2) Only Flex pipe purchased from Regency

®

may be used for Flex installations.

3) Regency

®

Direct Vent System (Flex) is only approved for horizontal terminations.

INSTALLATION

This manual is related to the following products: