Callpilot server installation, Callpilot server installation tasks, Rack-mounting the server – Nortel Networks NN44200-313 User Manual
Page 41
41
CallPilot server installation
This task describes the CallPilot server installation.
CallPilot server installation tasks
The following is a list of tasks you perform to install the CallPilot server. To
link to detailed procedures for each task, click the text.
•
"Rack-mounting the server" (page 41)
•
"Installing peripheral devices" (page 42)
•
"Installing cables and grounds" (page 43)
•
"Performing preboot checks" (page 45)
•
"Connecting the server to power and starting it" (page 45)
Rack-mounting the server
Perform the following procedure for four- or two-post rack-mounting.
The CallPilot server includes installation instructions for the 19” and 23”
Universal Rack Mount kits. Refer to the those instructions for more details.
Step
Action
1
Attach the inner rail to the chassis on both sides.
2
Attach the front-tab mounting bracket to the chassis on both sides.
The bracket is reversible for a flush mount install.
3
Using the four outer studs, assemble the mounting brackets to the
outer rail. Insert the four thread covers of the 4 inner studs.
For a two-post install, flip the mounting brackets so they are facing in
to each other.
Tech tip: Hand-tighten the nuts at this stage so you can adjust the
distance for the server and rack.
4
Install the two outer rail subassemblies.
Eight mounting screws are required for a four-post install. For a
two-post install, six mounting screws are required.
Nortel CallPilot
Quickstart Guide
NN44200-313
01.02
Standard
5.0
19 May 2008
Copyright © 2007-2008, Nortel Networks
.