Hardware installation, 1 front panel, Ront – Planet Technology WGS3-2840 User Manual
Page 9: Anel

- 9 -
2. HARDWARE INSTALLATION
This product provides three different running speeds – 10Mbps, 100Mbps and 1000Mbps in the same Layer 3 Managed
Switch and automatically distinguishes the speed of incoming connection.
This section describes the hardware features of Layer 3 Managed Switch. For easier management and control of the Layer
3 Managed Switch, familiarize yourself with its display indicators, and ports. Front panel illustrations in this chapter display
the unit LED indicators. Before connecting any network device to the Layer 3 Managed Switch, read this chapter carefully.
2.1 Front Panel
The Front Panel of the Layer 3 Managed Switch consists of 24x Auto-Sensing 10/100Mbps Ethernet RJ-45 Ports and
provides 4-Port Gigabit TP/SFP combo interfaces either can be 1000Base-T for 10/100/1000Mbps or 1000Base-SX/LX
through SFP (Small Factor Pluggable) interface.
The LED Indicators are also located on the front panel of the Layer 3 Managed Switch.
Figure 2-1: Layer 3 Managed Switch front panel
2.1.1 LED indicators
System
LED
Color
Function
PWR
Green
Lights to indicate that the Switch has power.
SYS
Green
Lights to indicate that Switch is operating.
Per 10/100Mbps port
LED
Color
Function
LNK
Green
Lights to indicate the link through that port is successfully established.
ACT
Orange Blink to indicate that the switch port is actively sending or receiving data.
Per 10/100/1000Base-T port /SFP combo interfaces
LED
Color
Function
LNK
Green
Lights to indicate the link through that port is successfully established.
ACT
Orange Lights to indicate that the switch port is actively sending or receiving data.