Lexmark 4059-XXX User Manual
Page 80

2-53
4059 Service Manual
4059-XXX
3
LVPS
Interconnect Board
If the +42 V dc test point does not
measure approximately +42 V dc,
check the continuity of the cable
connected between J3 on the fuser
control and J1 on the interconnect
board. If the cable does not measure
continuity, replace the cable. If the
cable measures continuity, check the
voltage at CN3-18 on the LVPS. The
voltage measures approximately
+42 V dc. If the voltage is correct,
replace the interconnect board
assembly. If the voltage is incorrect,
replace the LVPS.
4
Fuser DC Cable (Engine
Board to Fuser Board Cable)
Engine Board
Check for continuity of the DC fuser
cable that is attached between J2 on
the engine board and J1 on the fuser
control board. If the cable does not
measure continuity, replace the cable.
If the cable measures continuity,
replace the engine board.
FRU
Action
- E260d (142 pages)
- 6600 Series (173 pages)
- 10N0227 (1 page)
- Z12 (2 pages)
- 301 (144 pages)
- NO. 35 (1 page)
- Z65n (111 pages)
- dn2 (217 pages)
- 10E (144 pages)
- Z2300 (54 pages)
- 230 (213 pages)
- 310 Series (2 pages)
- PRO700 (24 pages)
- C 720 (18 pages)
- C520 (145 pages)
- X656 MFP (104 pages)
- Prospect Pro207 (27 pages)
- 337 (258 pages)
- OptraImage 242 (207 pages)
- T64x (6 pages)
- C524 (146 pages)
- 4098-001 (70 pages)
- 1200 Series (21 pages)
- X650 Series (8 pages)
- 5300 (179 pages)
- 302 (274 pages)
- 4549 (235 pages)
- 202 (320 pages)
- 4076-0XX (89 pages)
- 10N0016 (1 page)
- 5025 (171 pages)
- 1361760 (1 page)
- C 546dtn (6 pages)
- Interpret S400 (40 pages)
- x6575 (2 pages)
- 27S2156-001 (2 pages)
- MENUS AND MESSAGES C522 (55 pages)
- Z35 (101 pages)
- Z25 (24 pages)
- series x5100 (77 pages)
- Z82 (105 pages)
- 2500 Series (76 pages)
- 1200 (208 pages)
- Z33 (114 pages)
- 7600 Series (181 pages)