beautypg.com

Hydronic piping, 20°f temperature rise applications, 25°f temperature rise applications – Lochinvar KBII-I-O REV C 81 - 286 User Manual

Page 37: 35°f temperature rise applications

background image

37

Installation & Operation Manual

0

5

10

15

20

25

3

4

5

6

7

8

9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

81

106

151

211

286

Flow Rate (GPM)

Pressure Drop vs. Flow (Includes Secondary Piping)

Pressure Drop (Feet of Head)

Figure 6-3 Pressure Drop vs. Flow

20°F Temperature Rise Applications

Model

GPM

FT/HD

Minimum Pipe

Size

Pump

Grundfos

TACO

B & G

Armstrong

81

7.5

24

1"

UPS26-99F

0011

NRF-36

E7

106

9.8

27

1"

UPS26-99F

0013

NRF-36

E11

151

14.0

20

1"

UPS26-99F

0011

NRF-36

E7

211

19.6

29

1"

UPS32-160

1400-50

PL-55

E9

286

26.5

15

1-1/4"

UPS32-80

1400-20

PL-36

E11

Table 6A Circulator Recommendations for Temperature Rise Applications_20°, 25°, and 35°

25°F Temperature Rise Applications

Model

GPM

FT/HD

Minimum Pipe

Size

Pump

Grundfos

TACO

B & G

Armstrong

81

5.9

15.0

1"

UPS15-58FC

0014

NRF-36

E7

106

7.7

17.5

1"

UPS26-99F

0014

NRF-36

E7

151

11.0

12.8

1"

UPS26-99F

0014

NRF-36

E7

211

15.5

19.0

1"

UPS26-99F

0013

NRF-36

E7

286

21.0

11.5

1-1/4"

UPS26-99F

0011

NRF-36

E7

Pumps listed in bold type are provided by the factory as the boiler circulation pump on standard altitude
models.

NOTICE

35°F Temperature Rise Applications

Model

GPM

FT/HD

Minimum Pipe

Size

Pump

Grundfos

TACO

B & G

Armstrong

81

4.2

7.3

1"

UPS15-58FC

007

NRF-22

Astro-30

106

5.5

9.3

1"

UPS15-58FC

007

NRF-22

Astro-30

151

7.9

9.5

1"

UPS15-58FC

008/0010

NRF-36

Astro-30

211

11.0

9.1

1"

UPS15-58FC

0010

NRF-36

Astro-50

286

15.0

7.3

1-1/4"

UP26-64F

008/0010

NRF-36

E7

Pumps listed in italicized type are provided by the factory as the boiler circulation pump on high altitude
models.

NOTICE

The temperature rise provided by a pump/model combination will decrease by 3% per 1000 feet of elevation.

NOTICE

6

Hydronic piping

(continued)