Lt-82 setup and operating instructions, Unpack the product, Mount lt-82(s) in rack (if desired) – Listen Technologies Stationary LA-350 User Manual
Page 44: Interconnect multiple lt-82s (if necessary), Connect lt-82 rf signal to radiator(s)
38
LT-82 LT-82
Design GuideDesign Guide
LT-82
LT-82 Setup and Operating Instructions
1
Unpack the Product
Remove outer packaging and plastic cover. Verify all components are
present and no physical damage has occurred to the product.
2
If rack mounting the transmitter(s), install the optional rack mount kit (part LA-326) according to the
instructions included with the kit.
Mount LT-82(s) in Rack (if desired)
3
If installing more than one transmitter (for multi-channel applications) it will be necessary
WRGDLV\FKDLQWKHWUDQVPLWWHUV&RQQHFW5)RXWSXWRQÀUVWWUDQVPLWWHUWR5)LQSXWRQVHFRQG
transmitter. Continue daisy-chaining up to four transmitters (four channels).
Interconnect Multiple LT-82s (if necessary)
Rack Mount with dual units installed.
Rack Mount with single unit installed.
4
Connect RF output on transmitter to RF input on radiator. In multi-channel systems
connect the last transmitter in the daisy-chain to the radiator(s) RF input. See design
guide for more information on connecting multi-channel systems.
Connect LT-82 RF Signal to Radiator(s)
RF Signal on coaxial cable