beautypg.com

Datanet copper connections – Siemens DataNET Hub (DNH) User Manual

Page 40

background image

32

•••• Installation

2000585-001

DataNET Copper Connections,

Continued

Step Action

1.

Plug the DataNET Hub Signal Equalizer Board into the se-
lected Port interface connector.

2.

Connect the board’s pig tail leads to the corresponding hub
downlink port channel; red lead to (+) terminal, black lead to
(-) terminal and white lead to Gnd terminal. See Figure 2-1.

Master Port
Connectors
TB15 – TB18

3.

Connect the downlink signal wires to the removable port
connector (TB1) on top of the equalizer board. Positive to
(+) terminal; and Negative to (-) terminal. See Figure 2-1.

.

SW2

SW1

SW3

TB1Port
Connector

Board
Connector

GND

-

+

4.

If conduit is used the cable shield is only terminated at one
end of the cable. If shield is terminated at this end connect it
to terminal 3 (GND) on board. If using cable gland connec-
tors, cable gland will always connect the shield to the chas-
sis.

5.

Set the switches on the board to the correct settings; see
DataNET Hub Signal Equalizer Board Settings page 34.

Down Link Wiring with
DataNET Hub Signal
Equalizer Board