Installation, Overview, Overview 15 – Siemens DataNET Hub (DNH) User Manual
Page 23: On 15, Chapter 2
2000585-001
Installation
•••• 15
Chapter 2
Installation
Overview
This chapter is intended for installation personnel. After completing the
procedures in this chapter the Advance DataNET Hub (DNH) will be
ready for operation. To ensure a safe and trouble free installation, follow
all procedures and associated advisory information.
Ensure that all AC Power (Mains) Specification requirements and adviso-
ries are met. Failure to do so, and operating the equipment in a manner
not specified, may impair the safety protection provided by the equip-
ment.
Before beginning the installation process read through this Chapter to
familiarize yourself with the installations requirements. This will aid you to
ensure a safe and trouble free installation.
Topic
See Page
Unpacking and Inspection
Wall or Rack Mounting Installation
Site Wiring Requirements
CE Installations
Wiring Connections
AC Power (Mains) Connections
DataNET Copper Connections
DataNET Hub Signal Equalizer Board
Hub Signal Equalizer Board with Generic Cable
DataNET Fiber Optic Connections
Ethernet Connections
Introduction
WARNING
Installation Overview