beautypg.com

Sundance Spas CAMDEN 780 User Manual

Page 19

background image

Page 15

780 SERIES

2.

dedicated 240v Power Camden/Certa/Chelsee/Hamilton Models:

These spas must be permanently connected (hard-wired) to the power

supply.

No plug-in connections or extension cords are to be used

in conjunction with the operation of these spas. Supplying power

to these spas which is not in accordance with these instructions will

void both the independent testing agency listing and the manufacturer’s

warranty.

3. The power supplied to this spa must be a dedicated circuit with no other

appliances or lights sharing the power provided by the circuit.

4. To determine the current, voltage and wire size required, refer to Section

5.0 “Power Requirements” (pages 12-14).

Wire size must be appropriate per NEC and/or local codes.

We recommend type THHN wire.

All wiring must be copper to ensure proper connections.

do not use

aluminum wire.

When using wire larger than #6 (10 mm²), add a junction box near the

spa and reduce to short lengths of #8 (8.4 mm²) wire to connect to the

spa.

5. The electrical supply for this product must include a suitably rated switch

or circuit breaker to open all ungrounded supply conductors to comply

with Section 422-20 of the National Electrical Code, ANSI/NFPA 70. The

disconnecting means must be readily accessible and visible to the hot

tub’s occupant but installed at least 5 feet (1.5m) from the hot tub.

6. The electrical circuit supplied for the spa must include a suitable ground

fault circuit interrupter (GFCI) as required by NEC Article 680-42.

7. To gain access to the spa’s power terminal block, remove the screws

securing the cabinet panel on the side of the spa under the controls.

Then remove the four control box door screws and door (Figures A-B).

8. Select the power supply inlet you want to use (Figure A, page 16). Feed

power cable to control box, then install it through the large opening

provided in the bottom side of the box.

9. Connect wires, color to color, on terminal blocks TB1 and TB3 (Figures

C-F, page 17). TIGHTEN SECURELY! All wires must be hooked up

securely or damage could result.

10. Install control box door and screws and reinstall the cabinet side panels.