0 electrical wiring instructions, Electrical wiring instructions, If you – Sundance Spas CAMDEN 780 User Manual
Page 18: Danger
Page 14
780 SERIES
6.0 Electrical Wiring Instructions
IMPORTANT NOTICE: The electrical wiring of this spa
must meet the requirements of the National Electrical
Code (NEC) and any applicable state or local codes.
The electrical circuit must be installed by a qualified
electrician and approved by a local building/electrical inspection
authority.
1.
Convertible 120/240v Powered dover Models Only:
•
!
dANGER:
TO dECREASE THE RISK OF SHOCK,
PROdUCT dAMAGE OR ELECTRICAL FIRE.
120v “Plug-in” Operation: This spa must operate on the
supplied 10 foot (3m) 120V GFCI cord at its original length or
must be hard-wired for longer runs.
NEvER USE AN EXTENSION
CORd FOR ANY REASON!
• Convertible 120/240V Heater Operation: the included 120V GFCI
cord must be discarded for 240V heater operation. This spa must
be hard-wired. Supplying power to either configuration above
which is not in accordance with these instructions will void both
the independent testing agency listing and the manufacturer’s
warranty.
Export 2-Pump Certa/Chelsee/Hamilton Models (50 Hz)
230v/20A*
230v/30A**
230v/40A***
Voltage:
230 VAC
230 VAC
230 VAC
# of Wires:
3
3
3
Frequency:
50 Hz
50 Hz
50 Hz
Current Draw:
15A
23A
29A
Circuit Breaker:
20A*
30A**
40A***
* In 20A configuration, the heater
will not operate while either jets pump is
running in high speed.
This is the factory setting. Note: pump 2 runs
only in high speed.
** In 30A configuration, the heater
will not operate while both jets pumps
are running in high speed.
Note: pump 2 runs only in high speed.
*** In 40A configuration, the heater
will operate while both jets pump are
running in high speed.
Note: pump 2 runs only in high speed.