beautypg.com

Siemens PC 870 User Manual

Page 31

background image

Mounting

3-5

SIMATIC Panel PC 670 / 870 Operating Unit, Equipment Manual
Edition 07/01

L1

L2

112

±

0.5

L4

L5

11

2

±

0.5

±

1

56

min. 1.5 – max. 6

L3

±

1

A1

±

1

A2

±

1

Clamp with grub screws

Drill hole for

±

0.2

±

0.2

+1

+1

Rz 120 (in gasket area)

Gasket area

M6/ 7

Pressure points
for clamps

screw fixings

L3

±

1

112

±

0.5

Operating units

L1 L2 L3 L4 L5 A1 A2

(a) with key-based front panels:
12.1” TFT

450 290

78 465 235 16

10

15.1” TFT (8 modules)

450 321

51 465 279 16

17

(b) with touchscreen front panel:
15.1” TFT

450 290 81 465 235 16

10

*)

*)

*)

cut-outs only for 15” TFT

(keyboard version),
(for dimensions, see Fig. 3-2)

Fig. 3-4

Dimensions for installation of the operating unit of Panel PC 870

The clamps and grub screws required for installation are supplied with
the device. Proceed as follows:

1.

Insert the complete operating unit and computing unit into the moun-
ting cut-out prepared as described in Section 3.1, working from the
front.

2.

From the rear, fix the operating unit in position in the mounting cut-
out using the six clamps (see Figure 3-3) by tightening the grub
screws (torque 0.4 - 0.5 Nm).

3.

Hook the computing unit into the two hinges (see Figure 3-5).

4. Make the electrical connections.

5. Swing the computing unit to the operating unit and fix in position by

tightening the four knurled screws.

Installation with
clamp fixing