Upgrading sibs – Juniper Networks T1600 User Manual
Page 27

NOTE: After a power supply is powered on, it can take up to 60 seconds for status
indicators—such as the LEDs on the power supply, the
show chassis
command
display, and messages on the LED display on the craft interface—to indicate that the
power supply is functioning normally. Ignore error indicators that appear during the
first 60 seconds.
5.
Verify that the
CB ON
LEDs on the power supply faceplate are lit steadily. The
CB ON
LEDs blink momentarily, then light steadily to indicate that the circuit
breakers are on.
6.
Verify that the
DC OK
LED on the power supply faceplate is lit steadily, indicating
that the power supply is correctly installed and is functioning properly.
NOTE: After powering on a power supply, wait at least 60 seconds before turning it
off. If the system is completely powered off when you power on the power supply,
the Routing Engine boots as the power supply completes its startup sequence. If the
Routing Engine finishes booting and you need to power off the system again, first
issue the CLI
request system halt
command.
After powering off a power supply, wait at least 60 seconds before turning it back
on.
Upgrading SIBs
To convert an operational T640 routing node to a T1600 routing node, you upgrade
the standard SIBs or SIBs version B in the T640 routing node to T1600-SIBs. You
repeat the upgrade procedures for each of the five SIBs in the routing node.
NOTE: During the SIB upgrade:
■
The routing node should not experience packet loss if the traffic is less than
50 percent per Packet Forwarding Engine in each FPC.
■
The routing node might experience some packet loss if the traffic is more than
50 percent per Packet Forwarding Engine in each FPC, depending on the
operational environment.
For more information, contact your customer support representative.
■
Overview of Upgrading the SIBs on page 28
■
Preparing to Upgrade the SIBs on page 29
■
■
Removing a Standard SIB or SIB Version B on page 30
■
Installing a T1600-SIB on page 32
Upgrading SIBs
■
27
Upgrading SIBs