Operating instructions, Introduction, Applying power – Motorola MVME2400 User Manual
Page 41: Chapter 2, Introduction -1 applying power -1, 2operating instructions
2-1
2
2
Operating Instructions
Introduction
This chapter provides information about powering up the MVME240x
system, and functionality of the switches, status indicators, and I/O ports
on the front panels of the MVME240x and PMCspan modules.
Applying Power
After you have verified that all necessary hardware preparation has been
done, that all connections have been made correctly, and that the
installation is complete, you can power up the system. The MPU,
hardware, and firmware initialization process is performed by the PPCBug
firmware power-up or system reset. The firmware initializes the devices on
the MVME240x module in preparation for booting the operating system.
The firmware is shipped from the factory with an appropriate set of
defaults. In most cases there is no need to modify the firmware
configuration before you boot the operating system. Refer to Chapter 6 for
further information about modifying defaults.
The following flowchart shows the basic initialization process that takes
place during MVME240x system start-ups.
For further information on PPCbug, refer to Chapter 5, PPCBug; to
Appendix D, Troubleshooting the MVME240x; or to the PPCBug
documentation listed in Appendix A.