Completing the test procedures – Motorola BT100 User Manual
Page 43
4-4
Bench Testing
BT100 Installation and Operation Manual
Example:
11.2 dB (measured gain)
+ 1.0 dB (equalizer insertion loss)
+ 1.1 dB (power combiner)
+ 0.0 dB (pads)
+ 4.6 dB (cable simulator at 40 MHz)
17.9 dB (unit gain)
Completing the Test Procedures
The amplifier is now approximately tailored for a specific field location. Additional adjustments
after installation are minor in nature. Re-install the fuses removed during testing.
Complete station records by recording pertinent information. Remove test-equipment
connections and close the housing following instructions provided in Section 5, “Installation,”
Closing the Housing.