FUJITSU T1000 User Manual
Page 80
54
SPARC Enterprise T1000 Server Installation Guide • April 2007
H
handshaking setting for terminal, 27
hardware options, installing, 3
host firmware update, 43
I
initiating system power on, 36
installing
hardware options, 3
mounting brackets, 12
internal component installation by qualified service
IP address
gateway, 3
setting, netsc_ipaddr, 31, 49
system controller, 3
L
length of slide rails, adjusting, 15
locating pins for mounting brackets, 12
locks, mounting bracket, 6
logging in
SC network management port, 30
SC serial management port, 29
M
modem not for use with the sc serial management port, 22
mounting bracket
front lock, 6
locating pins on chassis, 12
locks, 6
part of slide rail assembly, 5
preparation for installation, 12
removing from slide rail, 12
side release button, 6
unlocking, 12
N
netmask
from system administrator, 3
setting, netsc_ipnetmask, 31, 49
network management port does not support Gigabit
network management port, system controller, 8
network setting, if_network, 31, 49
O
order of installation procedures, 3
P
parallel management port, 8
parity setting for terminal, 27
password for admin account, setting, 30
passwords, ALOM CMT, 26
pins, mounting bracket locating, 12
port locations illustrated, 8
power cycling the system, 40
powering on for the first time, 25
poweron
R
rack, defined, 4
removing server from rack, 21
resetsc
resetting
system controller, 34, 45
system with power cycle, 40
S
selecting a boot device, 47
sequential order of installation procedures, 3
serial management port, system controller, 8
serial terminal
required before powering on, 27
setenv boot-device
setting admin password, 30
command displays full path names, 48
slide rails
adjusting length, 15
spacing tool, 17
Solaris OS, preinstalled, 39
spacing tool for slide rails, 17
Standby mode, 24
standby voltage, 3.3v, 27
stop bit setting for terminal, 27