FUJITSU T1000 User Manual
Page 8
![background image](/manuals/105987/8/background.png)
vi
SPARC Enterprise T1000 Server Installation Guide • April 2007
▼
To Install the Cable Management Bracket
20
Removing the Server From the Rack for Service
21
▼
To Connect the SC Serial Management Port
▼
To Connect the SC Network Management Port
22
▼
To Connect the Ethernet Network Cables
▼
To Connect the AC Power Cable to the Server
23
3.
Powering On the Server for the First Time
25
26
26
▼
To Power On the System for the First Time
Logging In To the ALOM CMT System Controller
▼
To Log In To the System Controller Using the Serial Management Port
29
▼
To Log In To the System Controller Using the Network Management
30
▼
To Configure the System Controller Network Management Port
▼
To Reset the System Controller
Using the ALOM CMT System Controller for Common Operations
35
▼
To Initiate the Power On Sequence
▼
To Connect to the System Console
36
▼
To Perform a Normal System Initialization
Booting the Solaris Operating System
39
▼
To Boot the Solaris Operating System
▼
(Optional) To Reset the System
40