H3C Technologies H3C S9500E Series Switches User Manual
Installation guide
Table of contents
Document Outline
- Title Page
- Preface
- Contents
- Product overview
- Preparing for installation
- Installing the switch
- Confirming installation preparations
- Installing the switch in a rack
- Grounding the switch
- Installing the power system
- Installing a card
- Installing a subcard
- Connecting power cords
- Verifying the installation
- Connecting the switch to the network
- Cable routing recommendations
- Logging in to the switch
- Powering on the switch
- Connecting the switch to the network
- Hardware management
- Displaying the electrical label data for your switch
- Displaying the card information for your switch
- Rebooting your switch
- Displaying the power supply system of your switch
- Configuring temperature thresholds for a card
- Isolating a card and locating card faults
- Configuring in-service hardware failure diagnosis and failure protection
- Displaying the operating state of fans
- Displaying alarms present on a card
- Verifying and diagnosing transceiver modules
- Troubleshooting
- Replacement procedures
- Regulatory Compliance and Safety Information
- Appendix A Technical specifications
- Appendix B LEDs
- Appendix C Transceiver modules
- Appendix D Lightning protection
- Appendix E Engineering labels
- Appendix F Cable management
- Index