beautypg.com

Electrical requirements – Power Soak 33755 PS-225 Owner's Manual User Manual

Page 34

background image

30

The installation and initial operational check of your
new system must be performed only by licensed and
certified plumbers and electricians.

Be sure to follow all applicable national and local
electrical codes when installing the electrical supply
and/or a new breaker. DO NOT connect the system
using a power cord and plug or an extension cord of
any kind.

Please refer to the detailed installation instructions that were sent with your
Power Soak system.

Electrical Requirements

The electrical requirements of your new system are on the serial number plate
located on the front corner of the wash tank, adjacent to the control panel
enclosure and inside the enclosure itself.

All Power Soak systems have a single point electrical connection, and a
dedicated circuit is required. A ¾” seal tight conduct knock out is provided on the
rear of the control panel.

The system is completely pre-wired and tested at the factory, and a hard-wired
connection from an appropriate power source junction box is all that is required.

The installer is to provide a disconnect that should be incorporated in the fixed
wiring. Note: In areas where the walls are washed this should be a waterproof
style disconnect.

Properly sized watertight conduit, fittings and parts are required, as well as the
appropriate gauge wire.

If your system is a “left-to-right” unit, you should locate the power source junction
box at the left end of the system. (The opposite would be true for a “right-to-left”
system.)

Ideally, the junction box should be located on the wall directly behind the pump
motor and control panel.