Rtk network base station setup, Attaching rtk harness – John Deere STARFIRE RTK OMPFP11348 User Manual
Page 13
900 MHz RTK—Base Station Setup
JS56696,0000801 -19-15APR10-1/1
Attaching RTK Harness
PC8570
—UN—14JUL05
PC8568
—UN—14JUL05
PC8571
—UN—14JUL05
PC8569
—UN—14JUL05
A—Rod
B—Grounding Wire
C—Collar
D—Screw
CAUTION: Avoid serious injury or death to you or
others. Contact your local utility companies to
determine the location of gas, electric, or water
lines. Placement of grounding rod must be a safe
distance away from pipelines and cables.
IMPORTANT: Carefully choose location of rod so that
it is away from paths where it could damage
equipment or be damaged by equipment.
DO NOT route RTK Extension harness along any
other power sources. Keep harness at least 2m
(6 ft) away from any other AC power lines.
1. Attach harness between radio and receiver.
2. Carefully determine placement of rod (A) a safe
distance away from pipelines and cables. Drive into
ground leaving one end above surface.
3. Route grounding wire (B) from harness to rod.
Grounding wire may be extended if necessary to
reach rod.
4. Remove insulation from end of grounding wire.
5. Place collar (C) over end of rod.
6. Place grounding wire between rod and screw (D).
7. Tighten screw.
8. Restrain harness to supporting structures as
necessary to keep them away from equipment,
damage, and to reduce wire strain.
20-5
121511
PN=13