Installing the cable bracket, Configuration examples – HP 354556-002 User Manual
Page 52

52
HP BladeSystem p-Class Enclosure Installation Guide
WARNING: If using facility DC power, cables must be
connected by a licensed electrician or trained service personnel
familiar with high-power circuitry.
To connect the grounding cable:
1. Insert the mounting screw through the grounding cable lead and into the
enclosure (1).
2. Tighten the mounting screw to secure the grounding cable to the enclosure
(2).
3. Repeat steps 1 and 2 as needed for the configuration until all enclosures in
the rack are connected by the grounding cable.
4. Connect the lower end of the grounding cable to the facility grounding
connection.
Installing the cable bracket
Install the cable bracket (optional) provided with each power distribution kit.
Configuration examples
Refer to the following examples for typical HP BladeSystem configurations:
- UX B6941-90001 (548 pages)
- A3661B (95 pages)
- C100/110 (252 pages)
- L1702 (45 pages)
- 576X-B (1 page)
- rx5670 (13 pages)
- ProLiant PC2-6400 (38 pages)
- PC (120 pages)
- S3240 (2 pages)
- LC 2000R (194 pages)
- GS80 (41 pages)
- COMPAQ DX2710 MT (107 pages)
- TOUCHSMART 9100 (62 pages)
- BC1500 (13 pages)
- Proliant DL580 (48 pages)
- Proliant DL580 (53 pages)
- DX2200 (31 pages)
- ProLiant Server Blade BL460c (31 pages)
- P6000 (105 pages)
- d530 Series (2 pages)
- dc5700 (216 pages)
- RX7620-16 (43 pages)
- ProLiant ML370 G5 (46 pages)
- PROLIANT ML350 G6 (54 pages)
- BL35P (22 pages)
- COMPAQ DC5750 (214 pages)
- Agent-Desktop-Laptop Computer (23 pages)
- DL380 G7 (126 pages)
- xw8600 (73 pages)
- Pavilion A6140 (2 pages)
- Z800 (55 pages)
- 8080 ELITE BUSINESS (284 pages)
- VECTRA VL800 (72 pages)
- Vectra XE320 (82 pages)
- Vectra XE320 (32 pages)
- AA-RTDRB-TE (146 pages)
- BL465C (66 pages)
- DM4 (113 pages)
- PROLIANT 580554-001 (87 pages)
- ProLiant ML330 (34 pages)
- ProLiant ML330 (44 pages)
- PROLIANT BL465C G7 (30 pages)
- LH 3r (23 pages)
- Compaq dc7900 (3 pages)
- T5000 (41 pages)