Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
42
)."
Installing the server into the rack
20.41 - 27.22 kg
47.18 - 60.0 lb
WARNING: To reduce the risk of personal injury or damage to the equipment:
•
Observe local occupation health and safety requirements and guidelines for
manual handling.
•
Obtain adequate assistance to lift and stabilize the chassis during installation or
removal.
•
The server is unstable when not fastened to the rails.
•
When mounting the server in a rack, remove the power supplies and any other
removable module to reduce the overall weight of the product.
CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install
the heaviest item first, and continue to populate the rack from the bottom to the top.
1.
Install the server into the rack. Refer to the installation instructions that ship with the 2U Quick Deploy
Rail System for more information.
2.
Install the cable management arm into the rack.
NOTE: If the cable management arm is mounted on the right side of the rack, you will have to remove it
when adding or replacing a redundant hot-plug power supply.
3.
Connect peripheral devices to the server.
WARNING: To reduce the risk of electric shock, fire, or damage to the equipment, do not
plug telephone or telecommunications connectors into RJ-45 connectors.