2 led indicators, 3 injector rear panel – PLANET HPOE-1200G User Manual
Page 13

User’s Manual of HPOE-1200G / HPOE2400G
13
The following is the summary table of Reset button functions
:
Reset Button Pressed and Released
Function
About 1 second
Reboot the PoE Injector Hub.
About 8 second
Reset the PoE Injector Hub to Factory Default configuration.
The PoE Injector Hub will reboot and load the default IP
settings as below.
Be sure that you backup the current configuration of PoE Injector Hub before reset PoE Injector
Hub; else the entire configuration will be erased when pressing the “RESET” button.
2.1.2 LED Indicators
The front panel LEDs indicates instant status of system power, Management port Link/Active and PoE port links, helps
administrator to monitor and troubleshoot when needed.
LED
Color
Function
FAN1 Fail
Green
Lights to indicate FAN1 have been stop.
FAN2 Fail
Green
Lights to indicate FAN2 have been stop. (Only for HPOE-2400G)
Power1 Fail
Green
Lights to indicate one of power supply 1 has failure.
Power2 Fail
Green
Lights to indicate one of power supply 2 has failure. (Only for HPOE-2400G)
Power
Green
Lights to indicate power on.
PoE In-use
Green
Lights to indicate that the port is in use and supplying 48V DC power.
2.1.3 Injector Rear Panel
The rear panel of the PoE Injector Hub indicates an AC inlet power socket, which accepts input power from 100 to 240V
AC, 50/60Hz.
Figure 2-1-4 & 2-1-5
shows rear panel of the PoE Injector Hub.
Figure 2-1-4: HPOE-1200G Rear Panel
Figure 2-1-5: HPOE-2400G Rear Panel
The PoE Injector Hub is a power-required device, it means, PoE Injector Hub will not work till it is
powered. If your networks should active all the time, please consider using UPS (Uninterrupted Power
Supply) for your device. It will prevent you from network data loss or network downtime.
In some area, installing a surge suppression device may also help to protect your device from being
damaged by unregulated surge or current to the PoE Injector Hub or the power adapter.