Hardware installation, 1 desktop installation – PLANET XGS3-42000R User Manual
Page 5
3. Hardware Installation
During the installation and use of the XGS3-42000R Chassis Switch, please follow
step below:
Chassis Switch mounting
Desktop installation
Rack-mounting installation
Chassis Switch grounding
Modules installation
Removing and installing the dust gauze
Removing and installing the fan tray
Remover and installing the power supply
3.1 Desktop Installation
To avoid damage, do not place or make any weight on the XGS3-
42000R.
Maximum weight of various modue installed is 30KG.
To install a XGS3-42000R on a desktop or shelf, simply completed the following
steps:
Step1 Choose a smooth level workbench.
Step2 Verify that the workbench is strong enough to support the XGS3-42000R’s
fully configured weight.
Step3 Plan a good position for your XGS3-42000R that is easy to operate and
has an appropriate power source and grounding point.
Step4 Place the XGS3-42000R safely on the workbench; avoid obstructions on
any side of the Chassis Switch.
n
u
u
n
n
n
n
n